LocationsEquipmentResidentialAbout Us
Contact Us

EV Charger Site Survey

Help us prepare an accurate quote for your EV charger installation by completing this quick survey. Upload photos where requested. If you’re unsure about a question, you can leave it blank and we’ll confirm during our visit.

Photo Uploads

1) Utility Meter (required)

Stand back to show the meter and surrounding wall. If there are overhead wires, include where they attach. Include any ground rod if visible.

2) Main Electrical Panel or Garage Sub-Panel (required)

Open the door and photograph breakers. If safe, remove cover and photograph inside. Include the water meter or the wire attached to your water pipe.

3) Path from Panel to EV Charger Location (required)

Take several photos showing the route from your panel to the desired charger location, including any obstacles.

Inside Your Panel

Additional Details

By submitting, you agree WGE may contact you about your EV charger installation. We use this information only for project planning.

Subscribe to our newsletter

We do not share your info with third parties. Learn more in our Privacy Policy.

Copyright 2026 Welsh Global Energy. All rights reserved.